Kreem Café, Henderson
Structural engineering for a purpose-built café with exposed steel, high sloping ceilings and wide glazing.
Pukekohe Wastewater Treatment Plant
Temporary shoring for a 9 m deep pump station excavation at Pukekohe Wastewater Treatment Plant.
Hunua 4 Watermain
Trench shoring design for one of New Zealand's largest water pipeline projects.
Waitākere Tramline
Retaining and slip repair to reinstate a heritage tramline and 600 mm watermain in the Waitākere Ranges.