Pukekohe Wastewater Treatment Plant

Shoring for a 2,000 m³ excavation with walls up to 9 m high, designed quickly for soft soils, groundwater and crane loads of up to 300 tonnes.

Client
Fulton Hogan for Watercare
Services
Temporary works design · excavation shoring
Location
Pukekohe, Auckland
Scale
2,000+ m³ · 9 m walls · 300 t crane loads
Status
Complete 2016
Sheet-piled excavation with steel waling beams and a worker in hi-vis, part of the temporary works at the Pukekohe Wastewater Treatment Plant

01 / Project overview

The brief

Watercare's Pukekohe Wastewater Treatment Plant was upgraded in 2009, replacing 34.8 ha of treatment ponds with a plant on a 3.5 ha footprint. The next upgrade aims to rehabilitate a wetland and improve water quality in a tributary of the Waikato River, and includes a new wastewater pump station and storage tanks.

In 2016 we provided temporary works design for the excavation to house them: more than 2,000 m³, with walls up to 9 m high. The site combined soft soils, a nearby stream and groundwater, and the shoring had to carry crane loads of 100 and 300 tonnes alongside the excavation.

02 / Our approach

How we delivered it

Deep shoring in soft ground

Walls up to 9 m high in soft soils call for stiff, well-restrained shoring.

Designing for heavy cranes

Cranes of 100 and 300 tonnes worked beside the excavation, so their outrigger and track loads were designed into the shoring as surcharge.

Stream and groundwater

With a stream nearby and groundwater in the soft soils, the design had to manage groundwater effects on the excavation and its surroundings.

The balancing act

Temporary works at an operating plant are a balance of quick design turnaround, safety, reliability, ease of installation and removal, and cost. Our design was developed to meet the contractor's programme while keeping all of those in view.

03 / The outcome

“A 9 m deep excavation in soft, wet ground, shored quickly and safely so Watercare’s new pump station and storage tanks could be built at an operating treatment plant.”