New Lynn culvert

After extreme rain destroyed a culvert under Great North Road, we designed a new 50 m culvert in parallel with construction to reopen a key West Auckland route.

Client
Auckland Council & Fulton Hogan
Services
Three waters · Structural · Retaining · Temporary works
Location
Great North Road, New Lynn, Auckland
Scale
50 m culvert · 4 m × 2.75 m box · 8 m deep excavations
Status
Complete 2018
Precast box culvert section lowered by crane into the excavation, guided by workers in hi-vis

01 / Project overview

The brief

In March 2017, an extreme rainfall event in West Auckland caused the stormwater culvert beneath Great North Road in New Lynn to fail. Water overflowed onto the road and washed part of it away, private properties were damaged, and a multi-storey building had to be demolished. The affected section of the road was closed for several weeks.

We worked with Auckland Council to design the replacement. The site combined a century-old arch culvert, the Rewarewa Stream, deep excavations beside a major arterial road and pressure to get the road back in service quickly. Construction had to start before the design was finished, so every decision was made against an emergency programme.

02 / Our approach

How we delivered it

Reinforcement and formwork for a culvert chamber, with a pipe connection, during repairs

A new culvert above the old

We designed a 50 m culvert, including a new 4 m × 2.75 m box culvert built above the existing one, with inlet and outlet walls. The century-old arch culvert below was strengthened.

Retaining and stream protection

Stream-edge retaining walls stabilise the banks at the inlet and outlet. We also coordinated measures to protect the Rewarewa Stream during construction.

Temporary works for deep excavations

Excavations reached up to 8 m deep on a confined site next to the road and the stream. We designed the temporary works that kept them stable and safe throughout construction.

Designing while building

To speed up the emergency response, design and construction ran at the same time with Fulton Hogan. That meant design decisions had to be made quickly and in step with progress on site.

03 / The outcome

“A culvert that failed under a key West Auckland arterial was replaced with a larger, stronger structure, designed side by side with construction to get Great North Road back in service.”